The compacted layer needs to be at least 4 to 6 inches thick to be structurally sound.
Tamper for decomposed granite.
3 types and their best uses.
Southwest boulder stone 0 5 cu.
Decomposed granite per yard.
The following are the major disadvantages of decomposed granite.
Set your store to see local availability add to cart.
Decomposed granite or dg is a natural byproduct of the weathering and erosion of solid granite rocks.
Then repeat the process with the last 1 to 2 layer for extra depth for.
For optimum performance install 4 to 6 in.
Crushed rock fines ground cover for gardening and pathways model 02 0148 30 98 30 98.
The better the compaction the better the results.
X research source for example a hole 20 ft long 10 ft wide and 4 in deep is about 66 cubic feet.
Once the decomposed granite is level use a hand roller compactor or hand tamper to finish the job.
Dg is composed of granite fines and small pieces of granite.
Holding the end of the rod bash the metal plate straight down against the granite repeatedly.
Dg is a combination of small granite pieces inch or smaller and fine granite which can resemble sand.
A handheld tamper consists of a flat heavy metal plate with a long rod or handle.
Rake or screed to the desired level and slope to allow water run off.
Hand tamper or use a vibra plate it to settle.
Equipped with 8 x 8 base plate cast iron base and 10 rubber grip.
Category 06 group 605 use to flatten and smooth dirt stone and asphalt.
Decomposed granite tends to get muddy during the winter when there is high rainfall.
Decomposed granite per ton as a general rule 1 ton of 3 8 or 1 4 of crushed stone or decomposed granite material will cover a little over 100 square feet of an ground area at a 2 1 2 depth.
Stabilizing your decomposed granite patio or pathway is easy using gator stone bond.
Before starting your project be sure to read this 10 step guide.
This combination has a high tendency of fusing together with the presence of water.
Disadvantages of decomposed granite.
Step 10 allow the gator stone bond to cure for 24 48 hours at a temperature of about 60.
It is like gravel but finer and more stable.
December 29 2017 david.
1 it gets muddy.
Category 06 group 607 compacts clay and dirt.
Spread surface aggregate over the compacted structural stone base.
Of 3 4 minus crushed stone then compact using a vibratory plate compactor in restricted areas where a compactor will not fit use a hand tamper.
Ideal for small confined spaces such as trenches and foundations.